PROJECT RESULTS
Key numbers from this project.
Contract value
58,34mln PLN
Clients
JSW · PGG
Scope
Electrical & LED
Safety
Heightened BHP
Context & Challenge
In an industrial environment, modernisation cannot disrupt facility operations. Lighting and power supply infrastructure must function reliably, and works must be conducted under elevated health and safety requirements and facility procedures. Equally critical is reducing maintenance costs and failure rates — because downtime is a real cost.
Scope & Solution
The scope included modernisation of electrical power installations, switchgear and power supply infrastructure works, and replacement of industrial lighting systems with LED — depending on the facility's needs. Implementation was conducted in stages, with emphasis on safety, work documentation, and maintaining the required technical standard.
Outcome
Deliveries for the mining sector confirm Linter Energia's competencies in working with infrastructure under elevated requirements — where quality, predictability, and execution responsibility matter most. This experience also strengthens municipal projects by transferring the organisational and technical standards typical of industry.