PROJECT RESULTS
Key numbers from this project.
Contract value
~565 k PLN
Luminaires installed
58
Programme
Polski Ład
Year
2024-2025
Context & Challenge
The project carried out in Gmina Przystajń focused on modernizing the street lighting control system to improve its efficiency and reliability. The key challenge was to adapt the existing infrastructure to modern control standards while ensuring stable and safe operation of the lighting system.
Scope & Solution
The investment included the modernization of 58 street lighting control cabinets, 43 of which were transformer stations. The work also involved the necessary coordination, technical testing, and preparation of documentation required for the commissioning and handover of the installation. The implemented solutions allow for more effective management of the lighting system.
Outcome
The result of the project is an increase in the reliability and functionality of the street lighting control system. The modernization contributed to improved operational efficiency and created conditions for further optimization of energy consumption.